In early 2024, Mr. Lin sent a short email to YG Machinery. The subject line was direct. It read: “Hydraulic breaker for 30 ton excavator.” Lin owned a demolition company in Johor, Malaysia. He used a 31-ton Komatsu excavator. His crew needed to remove a 200-meter concrete bridge. The bridge pillars contained hard granite aggregate. His old tool took three hours to crush one pillar. It also overheated every two hours. Lin needed a reliable tool for the job. That email started a 60-day project.

Project Snapshot
| Project Detail | Information |
|---|---|
| Client | Malaysian Demolition Contractor (Johor) |
| Carrier Machine | 31-ton Komatsu Excavator |
| Model Selected | YG1500 (Side Type) |
| Core Challenge | Hard granite aggregate, frequent overheating |
| Result | 60% faster crushing, zero downtime in 60 days |
Not sure which breaker fits your excavator? [Check our compatibility chart here.]
Start Your Project with the Right Equipment
First Inquiry: Why Mr. Lin Needed a Reliable Hydraulic Breaker for 30 Ton Excavator
Lin’s first email was very brief. The subject line had only six words. The message was just as short. He explained his current crisis. The bridge pillars had heavy steel rebar. The surrounding concrete contained hard granite. His old breaker was undersized. It often jammed against the rebar. The hydraulic hoses also kept leaking. Lin asked for a quick quote. He needed a reliable tool before next Monday.
Our engineer replied within two hours. We needed exact data to ensure a perfect fit. We asked three specific questions. First, what is the precise machine weight? Second, what is the primary pump flow rate? Third, what chisel diameter does he prefer? Lin answered immediately. His Komatsu weighed exactly 31 tons. The main pump flow was 210 L/min. He wanted a 150mm chisel.
We checked our engineering catalog. The YG1500 model was the perfect match. It fit the 27-35 ton excavator class perfectly. The machine required an oil flow of 150 to 190 L/min. Lin’s flow rate easily met this standard. We sent the recommended model details. We promised to provide a formal quotation by the end of the day.
Video Call with a Hydraulic Rock Breaker Manufacturer
We scheduled a video call the next morning. As a professional hydraulic rock breaker manufacturer, YG believes in full transparency. Our engineer stood on the factory floor. He walked Lin through the assembly line.
He explained three critical technical points:
- Nitrogen Charging: We use high-purity nitrogen. This maintains stable impact energy.
- Housing Material: The body uses high-strength alloy steel. It complies with ISO 9001 and EN 474-1 safety standards.
- Impact Energy: The machine delivers 4,961 Joules. It hits 350 to 700 times per minute.
Lin asked about the granite. Our engineer confirmed the 150mm chisel would handle it. Lin requested a formal quotation. We sent it that afternoon. The quote included the breaker, hoses, chisel, and shipping to Port Klang.
Parameter Review: Choosing the Right Excavator Breaker Attachment
We sent Lin the full parameter table. This excavator breaker attachment fits 27- to 35-ton machines. The operating pressure is 160 to 180 kg/cm². The oil flow is 150 to 190 L/min.
Lin chose the side-type mounting. Top-type mounts can block the operator’s view. Side-type mounts give a clear view of the chisel. Lin confirmed the order. He paid a 30% deposit by wire transfer. Our factory started production the next morning.
| Model | Chisel Dia. (mm) | Excavator Class (t) | Side Type (kg) | Operating Pressure (kg/cm²) | Oil Flow (L/min) | Frequency (bpm) | Breaking Power (J/kg.m) |
|---|---|---|---|---|---|---|---|
| YG1400 | 140 | 18-26 | 1763 | 160-180 | 120-180 | 350-500 | 4500 / 459 |
| YG1500 | 150 | 27-35 | 2214 | 160-180 | 150-190 | 350-700 | 4961 / 506 |
| YG1550 | 155 | 28-36 | 2573 | 180-200 | 200-260 | 250-400 | 6800 / 704 |
Want to see the YG1500 breaking granite in our factory? [Watch the test video here.]
Compare Models and Get a Quote


Factory Inspection and Testing the Unit
Production took exactly 15 working days. Our engineers built the YG1500 using high-strength alloy steel. Every unit undergoes strict quality control. On day 16, we mounted the breaker on our test bench. We simulated the real excavator hydraulic system. The pump pressure held steady at 180 kg/cm². We set the oil flow at 170 L/min. The nitrogen pre-charge pressure also met the exact standard. The machine ran continuously for four hours. It showed zero hydraulic leaks and no overheating.
We recorded the entire test process on video. The operator struck a solid concrete testing block. The camera clearly showed the impact frequency counter. The counter read exactly 420 beats per minute. We sent this unedited video to Mr. Lin via WhatsApp. He checked the hydraulic hoses and connection points. He approved the test results within one hour.
Our packaging team started the shipment preparation immediately. They applied anti-rust oil to the bare steel surfaces. They placed the heavy unit onto a reinforced steel pallet. Heavy-duty ratchet straps secured the breaker tightly. The spare hoses and the 150mm chisel went into a wooden crate. We used a forklift to load everything into a 20-foot container. The team added extra wooden blocks to prevent shifting. We took detailed photos of the container interior before closing the doors.
Shipping and Customs Clearance in Malaysia
The container left our factory on day 18. The sea freight took 12 days. The vessel arrived at Port Klang on day 30. Lin arranged his own customs broker. We provided the commercial invoice, packing list, and bill of lading. Customs cleared the goods in three days.
A flatbed truck delivered the breaker to his yard in Johor on day 36. Lin sent us a photo. The paint was intact. The hoses were packed safely in a separate box. The total transit time was under four weeks.
On-Site Training and Installation
We provided remote installation support via video call. Our engineer guided Lin’s lead mechanic. The mechanic connected the hoses to the excavator. They checked the hydraulic oil level. They mounted the 150mm chisel. The installation took exactly two hours.
We spent the next day training the operator. The training focused on three safety rules:
- Keep it straight: Always keep the chisel perpendicular to the concrete.
- No prying: Never use the breaker to pry out rocks.
- No blank firing: Never strike without solid contact.
The operator practiced on a small concrete wall. The machine felt very stable on the 31-ton carrier. He quickly felt comfortable with the controls.
Boost Productivity—Get a Free Quote
Formal Operation: How the Excavator Demolition Hammer Performed
Production started on day 40. Lin’s crew worked 8 hours a day. The excavator demolition hammer ran continuously. It crushed one bridge pillar in 45 minutes. The old breaker took three hours. The 150mm chisel stayed sharp. The hydraulic system stayed cool. The machine followed strict safety protocols.
Lin tracked the daily output. The crew broke 400 cubic meters of concrete in the first week. The operator greased the chisel every two hours. This simple maintenance kept the machine running smoothly.
Here is the 60-day data comparison:
| Metric | Old Breaker | YG1500 Breaker |
|---|---|---|
| Time to crush one pillar | 3 hours | 45 minutes |
| Overheating issues | Frequent | Zero |
| Downtime in 60 days | 5 days | 0 days |
| Fuel consumption | High RPM | Lower RPM (Fuel saving) |


Customer Feedback and Future Orders
Mr. Lin sent a detailed feedback report after 60 days. His crew successfully demolished 15 bridge pillars. He stated the demolition time dropped by exactly 60%. The machine ran 8 hours a day without a single breakdown. His mechanics praised the easily accessible grease points. They now spend only 10 minutes on daily maintenance.
Lin also noticed a significant drop in fuel costs. The excavator now runs at 1,400 RPMs instead of 1,800. This saved his company about 15% on diesel. “The YG1500 is very reliable,” Lin wrote in his email. “We finally finished the bridge project ahead of schedule.”
Lin is currently bidding on a new highway expansion project. He will need a second hydraulic breaker hammer for this new site. His secondary carrier is a 35-ton Volvo excavator. He requested a quotation for the YG1650 model. This model perfectly matches his 35-ton excavator class. It delivers 7,308 Joules of breaking power.
We sent the updated quotation and compatibility chart last week. Lin plans to place the formal order next month. He also requested a small stock of spare chisels. We will process the new production as soon as the deposit arrives.
Frequently Asked Questions (FAQ) About Hydraulic Rock Breaker
Check the excavator class in our parameter table. The YG1500 fits machines weighing 27 to 35 tons. You can also send us your machine model and flow rate.
The YG1500 needs an oil flow between 150 and 190 L/min. It also requires an operating pressure of 160 to 180 kg/cm².
Check the nitrogen pressure every 100 working hours. Recharge it when the pressure drops below the standard level. This keeps the impact energy stable.
The standard model is for dry land demolition. We offer customized waterproof kits for underwater work. Let us know your job site conditions.
Production takes 5-7 working days. Sea freight to Port Klang takes about 12 days. Total delivery is usually under four weeks after order confirmation.
Contact YG Machinery today for your hydraulic breaker needs for a 30-ton excavator. Tell us your machine weight, flow rate, and job site conditions. We will recommend the right model and send you a full price including shipping to your port. Every machine comes with a 12-month warranty and lifetime technical support.